2015:
Çamlı Yem Besicilik Sanayii ve Ticaret A.Ş., İzmir / Türkei
Capacity: 350 m³/h, Multi – Stage – Filtrationsystem.
Partners: Sigmund Lindner, Günal Enternasyonal
2016:
Kılıç Holding, Güvercinlik, Bodrum / Türkei
|
2016: Treatment of sea water for breeding of young fish(Dentex, Dorade and perch).
Capacity: 150 m³/h, Multi – Stage – Filtrationsystem.
Partners: Sigmund Lindner, Günal Enternasyonal
Takeda GmbH, Betriebsstätte Oranienburg
|
2016: Designing a new concept for wastewater treatment.
Capacity : 10 m³/d, chemical treatment.
Partners: Technical University Berlin
Environmental Emergency & Security Services - (ES)², Paris
|
2016: Market research for civil protection and disaster response in Germany
|
Celal Bayar University, Manisa / Turkey
2016: Filterdesign, 2 prefilters for RO-installation
Capacity: 2 x 110 m³/h
Partners: GPM Watermıll, Sigmund Lindner, Günal Enternasyonal
2017:
Kılıç Holding, Güvercinlik, Bodrum / Turkey
2017: Second system for treatment of sea water for breeding of young fish(Dentex, Dorade and perch).
Capacity: 200 m³/h, Multi – Stage – Filtrationsystem.
Partners: Sigmund Lindner, Günal Enternasyonal
2018:
Takeda GmbH, branch office Oranienburg
2017: Preparing a concept for a new wastewater treatment system for highly contaminated wastewater .
Capacity: 10 m³/d, chemical processing .
CSNR Technologies Ltd.
2017: Development of a novel, mobile water treatment system for military and civil forces in areas without infrastructure
IFRC / SRC
2018: Design and construction of a semi-stationary wastewater treatment plant in Rohingya - Balukhali refugee camp in southern Bangladesh (Cox’s Bazar)
Capacity: upto 5.000 people.
2019:
Engineering office Sames
2018: Feasibility study for decentralised stationary drinking water treatment systems in Guinea-Bissau
IFRC / SRC
2019: Operating and technical upgrade of a semi-stationary wastewater treatment plant in Rohingya - Balukhali refugee camp in southern Bangladesh (Cox’s Bazar)
Capacity: for 5,000 people.
Akpamuk Iplik
2019:Upgrade of an ion exchanger system in textile yarn production in Turkey
Capacity: 100 m³/h
Partners: Koralay Mühendislik, Sigmund Lindner
IFRC
2019:Planning of a second semi-stationary wastewater treatment plant for refugee camps
Capacity: for 20,000 people
Public utilities Trabzon
2019: : Introduction of the "FastPack" technology and MC-RIM-PW products in a pilot project
Partner: MC Bauchemie